Photo info

Navigator

  • The PDS and some air-conditioning relics, ready for junking.
  • As piles of ash are removed, the courtyard has the top few cm of contaminated soil removed as well.
  • Clearing the front offices. Note the collapsed wall.
  • Same area later the same day, from the other side.
  • Roofing removed from walkways and outbuildings of main block.
  • Western end of main hall, now clear.
  • Entry and front offices.
  • Clearing the north-south hallway. Note the large fallen concrete lintel.
  • About half the pipes that ran under the N-S hallway.

Roofing removed from walkways and outbuildings of main block.

                                                                                                                      Roofing removed from walkways and outbuildings of main block.                           More
Roofing removed from walkways and outbuildings of main block. NOTE: All images and movies are copyright and must not be reproduced or mirrored in any form without written permission.