MSSSO Schedule for Winter Quarter 2003 - Version: 14-07-2003

A PostScript version of this schedule and the Latex source for the Time application form are available by anonymous ftp from ftp://ftp.mso.anu.edu.au/pub/mso_tac.

DateDOWM 16"24"40"2.3mAATParkesNarrabri
2003-05-01Thu||||||||||     Breger Shutter repair Warren      
2003-05-02Fri||||||||||     Motorised Filter Box Weldrake DBS+Imager DaCosta,Freeman    
2003-05-03Sat||||||||||     " WFI " "    
2003-05-04Sun||||||||||     " " " "    
2003-05-05Mon|||||||||     " " " "    
2003-05-06Tue|||||||||     " " Warren "    
2003-05-07Wed||||||||     " " CASPIR      
2003-05-08Thu|||||||     " " "      
2003-05-09Fri||||||     " " Salvo      
2003-05-10Sat|||||     " " DBS+Imager      
2003-05-11Sun||||     " " "      
2003-05-12Mon|||     " " Kiss      
2003-05-13Tue||     " " DBS      
2003-05-14Wed|     " " "      
2003-05-15Thu      " " "      
2003-05-16Fri      " " Kiss      
2003-05-17Sat      " " Imager      
2003-05-18Sun      " " "      
2003-05-19Mon|     " " "      
2003-05-20Tue||     " " "      
2003-05-21Wed|||     " " "      
2003-05-22Thu||||     Wu " "      
2003-05-23Fri|||||     photo-multiplier " Mackie      
2003-05-24Sat||||||     " " DBS      
2003-05-25Sun|||||||     " " "      
2003-05-26Mon|||||||     " " Lee      
2003-05-27Tue||||||||     " Mackie Imager+DBS      
2003-05-28Wed|||||||||     " WFI " Freeman,Bessell,Aspl    
2003-05-29Thu|||||||||     " " " "    
2003-05-30Fri||||||||||     " Drew " "    
2003-05-31Sat||||||||||     " Imager Whiting "    
2003-06-01Sun||||||||||     " " DBS+Imager "    
2003-06-02Mon||||||||||     " McNaught " "    
2003-06-03Tue|||||||||     " Imager "      
2003-06-04Wed|||||||||     " " Whiting      
2003-06-05Thu||||||||     " Parker CASPIR      
2003-06-06Fri|||||||     " Imager Salvo      
2003-06-07Sat||||||     " " DBS+Imager      
2003-06-08Sun|||||     " McNaught "      
2003-06-09Mon||||       Imager        
2003-06-10Tue|||       " Gurovich      
2003-06-11Wed||       " CASPIR      
2003-06-12Thu|       " "      
2003-06-13Fri|       " Wood      
2003-06-14Sat        " CASPIR      
2003-06-15Sun        " "      
2003-06-16Mon      Handler " "      
2003-06-17Tue|     MFB Peterson Hinkle      
2003-06-18Wed|     " WFI Nasmyth Echelle      
2003-06-19Thu||     " " "      
2003-06-20Fri|||     " " "      
2003-06-21Sat||||     " " "      
2003-06-22Sun|||||     " " "      
2003-06-23Mon||||||     " " "      
2003-06-24Tue|||||||     " " Gurovich      
2003-06-25Wed||||||||     " " DBS + Imager      
2003-06-26Thu||||||||     " " "      
2003-06-27Fri|||||||||     " " Kawka      
2003-06-28Sat||||||||||     " " DBS      
2003-06-29Sun||||||||||     " " "      
2003-06-30Mon||||||||||     " " "      
2003-07-01Tue||||||||||     " McNaught Parker      
2003-07-02Wed||||||||||     " Imager DBS      
2003-07-03Thu|||||||||     " " "      
2003-07-04Fri|||||||||     " Steininger "      
2003-07-05Sat||||||||     " Imager "      
2003-07-06Sun|||||||     " " "      
2003-07-07Mon||||||     " " " Bessell    
2003-07-08Tue||||     " " Salvo "    
2003-07-09Wed|||     " " DBS+Imager "    
2003-07-10Thu||     " " "      
2003-07-11Fri|     " " Bessell      
2003-07-12Sat|     " " DBS+echelle      
2003-07-13Sun      " " "      
2003-07-14Mon      " " Gurovich      
2003-07-15Tue      " " CASPIR      
2003-07-16Wed      " " "      
2003-07-17Thu|     " " Engineering      
2003-07-18Fri||       McNaught "      
2003-07-19Sat||       Imager        
2003-07-20Sun|||       "        
2003-07-21Mon||||       " Johnston      
2003-07-22Tue|||||       " DBS      
2003-07-23Wed||||||       " "      
2003-07-24Thu|||||||       " Thom      
2003-07-25Fri||||||||       McNaught/Massey DBS+Imager      
2003-07-26Sat|||||||||   Bessell   eyepiece "      
2003-07-27Sun|||||||||   Hasselblad camera   " "      
2003-07-28Mon||||||||||   "   Jackson "      
2003-07-29Tue||||||||||   "   WFI "      
2003-07-30Wed||||||||||   "   " "      
2003-07-31Thu||||||||||   "   " "      
Notes:
UNSHEDULED TIME MUST BE APPLIED FOR BY EMAIL TO THE CHAIR OF TAC, PETER WOOD (wood@mso.anu.edu.au).
All changes to the schedule MUST be emailed to Peter Wood or Vince Ford (vince@mso.anu.edu.au) allowing at least 7 days notice.
Allow at least 3-4 days for equipment changes.
TARGET OF OPPORTUNITY OVERRIDES:
**PRICE ET AL have been granted the following overrides:
3 of up to 1 hr on the DBS (no grating change); 3 of up to 1 hr on CASPIR; 10 of up to 2 hr on the 40".
There is a maximum of 1 override per observing run on the DBS and CASPIR, and 2 on the 40".
Price et al are to contact the observers with instructions, and offer joint authorship to the observer (one person) on the publication of the observations.
**SALVO ET AL have been granted the following overrides:
10 of up to 1 hr on the DBS (no grating change), spaced no closer than every 3rd night; 15 of up to 30 min on the 40", spaced no closer than every 2nd night.
Multiple overrides per observer are possible, but within the constraints above.
Salvo et al are to contact the observers with instructions. They will offer to use their time allocation on the 2.3m to pay back observers for TOO time usage.



tac : tacinfo@mso.anu.edu.au