Skip Navigation | ANU Home | Search ANU | Directories
The Australian National University
Research School of Astronomy and Astrophysics
Mount Stromlo and Siding Spring Observatories
Printer Friendly Version of this Document
Technology
Technology

All Current Pictures of E2V Eng. CCD Installation.

Status, April 18th, 2007

The following is a comple set of pictures taken in the new AITC Clean Room
(Room LG1.13) during the course of the last week.
These pictures detail the setting up of the Vacuum Jacket and the subsequent
installation of the 4 E2V SkyMapper Eng. CCDs.

Thanks Bernie Keys, Andre de Gans & errol Kowald who are have designed,
made or fabricated the electronics parts for the inside and outside
connectivity.

Again thanks to Peter Conroy & Andrew Garnlund for the design, fabrication
and Assembly of the SkyMapper Vacuum Jacket.
And to Col Vest and the workshop for doing part of the construction work.


Moving Vacuum Jacket into the Clean Room,
Testing Connectivity & Signal levels for all 4 Flexes.

1. 2. 3.

4. 5. 6.

7. 8. 9.

10. 11. 12.

13. 14. 15.

16. 17. 18.

19. 20. 21.

22. 23. 24.

25. 26. 27.

28. 29. 30.

31. 32. 33.


Installation of Engineering CCDs into Vacuum Jacket.

1. 2. 3.

4. 5. 6.

7. 8. 9.

10. 11. 12.

13. 14. 15.

16. 17. 18.

19. 20. 21.

22. 23. 24.

25. 26. 27.

28. 29. 30.

31. 32. 33.

34. 35. 36.

37.


Enquiries about the SkyMapper Eng CCD Test Phase?
detman@mso.anu.edu.au