next up previous contents
Next: Down-Loading The ACE2 Program Up: Observing Procedures Previous: Observing Procedures

Down-Loading The LSI-11/23 Program

 

It should only be necessary to down-load the LSI-11/23 software at the beginning of an observing run or after a power failure. To down-load  the LSI-11/23 software type:

DOWN_LOAD

This takes about two minutes, and when successfully completed will print the following on the terminal window:

PASDBG V02.4
%PASDBG-I-NODSM No DSM - target not yet loaded

PASDBG>
%PASDBG-I-BOOT1 Loading Bootstrap
%PASDBG-I-BOOT2 Loading User Image. Please Wait.
PASDBG V02.4
      Target stopped at physical (00002056), virtual (002056): JMP @#2422
      Executing KERNAL code
      No process set, physical mapping in effect
PASDBG>

If it does not print this, the LSI-11/23 was probably already running and you have just bombed it! Don't panic, just type DOWN_LOAD again.



Kabal
Thu Jun 5 16:44:21 EST 1997