AUSTRALIAN
NATIONAL UNIVERSITY System Design Note 4.09 Created: 1 March 2001 Last modified: 21 March 2001 |
ACCEPTANCE TEST PLAN
Jan van Harmelen
Research School of Astronomy
and Astrophysics
Institute of Advanced
Studies
Australian National
University
Revision History
|
Revision No. |
Author & Date |
Approval & Date |
Description |
|
Revision 1 |
Jan van Harmelen 22 January 2001 |
Peter J. McGregor 01 March 2001 |
CDR version. |
|
|
|
|
|
Contents
6 Verification by
Demonstration
The Acceptance Test Plan describes the tests and inspections leading to pre-shipment acceptance of the Near-infrared Integral Field Spectrograph, consistent with the requirements of the instrument.
The required contents of the Acceptance Test Plan are described in clause 4.3(b)(10) of Exhibit A, “Statement of Work”, of the NIFS Design and Fabrication Contract.
|
Document
ID |
Source |
Title |
|
GEM00234 |
AURA |
NIFS Design and Fabrication Contract |
|
GEM00234a |
AURA |
NIFS Design and Fabrication Contract, Statement of Work |
|
SDN0003.02 |
RSAA |
NIFS Functional and Performance Requirements Document |
|
|
|
|
This document describes the acceptance test plan for the Gemini Near-infrared Integral Field Spectrograph (NIFS). It contains the following components:
· A summary matrix listing all of the requirements with an indication of how each requirement will be verified.
· Descriptions of the procedures for each test, analysis, and inspection to be performed in sufficient detail to allow AURA to evaluate the appropriateness of each procedure.
· Descriptions of the tests and inspections to be performed after arrival at the delivery location to confirm that NIFS continues to meet the specifications after transportation.
· Descriptions of the facilities and resources that will be needed at the delivery location to support assembly and testing of the instrument after it is delivered.
The matrix below relates each of the requirements listed in the NIFS Functional and Performance Requirements Document (FPRD), and thus including those listed in the NIFS Operational Concept Definition Document (OCDD), which in turn include the requirements stated in the NIFS Design and Fabrication Contract, to a method of verifying compliance described elsewhere in this document.
Requirements compliance, which cannot be exhaustively tested during pre-delivery testing, has been marked with a reference to the Verification and Commissioning Plan for final acceptance testing.
Notes:
1. Parts of NIFS are built to designs by the University of Hawaii and parts of the OIWFS are manufactured at UH. These designs have been accepted by the NIFS developers without analysis.
|
Requirement |
Description |
Pre-Acceptance Tests |
Final Acceptance Tests (V&C Plan) |
|
REQ-OCD-0001 |
Operation with ALTAIR |
Analysis |
Test §6.1 |
|
REQ-OCD-0002 |
Wavelength Coverage |
Analysis |
Test §4.15 |
|
REQ-OCD-0003 |
Spatial Resolution |
Analysis |
Test §5.8 |
|
REQ-OCD-0004 |
Field of View, Distortion |
Analysis |
Test §5.9 |
|
REQ-OCD-0005 |
Strehl Ratio |
Analysis |
Test §6.2 |
|
REQ-OCD-0006 |
Spectral Resolution |
Analysis |
Test |
|
REQ-OCD-0007 |
System Efficiency |
Analysis |
Test §5.11 |
|
REQ-OCD-0008 |
System Emissivity |
Analysis |
Test §5.12 |
|
REQ-OCD-0009 |
Scattered Light |
Analysis |
Test §5.23 |
|
REQ-OCD-0010 |
Ghost Images |
Analysis |
Test §5.22 |
|
REQ-OCD-0011 |
Contrast Ratio |
Analysis |
Test §5.27 |
|
REQ-OCD-0012 |
Detector Read Noise |
Test |
Test §4.8 |
|
REQ-OCD-0013 |
Detector Dark Current |
Test |
Test §4.10 |
|
REQ-OCD-0014a |
OIWFS for Tiptilt and Focus |
Demonstration (1) |
|
|
REQ-OCD-0014b |
OIWFS Field of View |
(1) |
Test §5.19 |
|
REQ-OCD-0014c |
OIWFS Offsetting Accuracy |
Test (1) |
Test §5.17 |
|
REQ-OCD-0014d |
OIWFS Position Repeatability |
Test (1) |
Test §5.16 |
|
REQ-OCD-0014e |
OIWFS Sensitivity |
(1) |
Test §5.21 |
|
REQ-OCD-0015 |
Mechanisms Time to Function |
Test |
Test §4.7 |
|
REQ-OCD-0016 |
Not used |
- |
|
|
REQ-OCD-0017 |
Downtime |
Analysis |
|
|
REQ-OCD-0018 |
Data Assessment |
Demonstration |
|
|
REQ-OCD-0018a |
Idle and Run Mode QLDs |
Demonstration |
|
|
REQ-OCD-0018b |
Idle Mode data displayed |
Demonstration |
|
|
REQ-OCD-0018c |
Run Mode data displayed and archived |
Demonstration |
|
|
REQ-OCD-0018d |
QLDs display raw data, spectrally compressed data and spectrum |
Demonstration |
|
|
REQ-OCD-0018e |
QLD frame subtraction |
Demonstration |
|
|
REQ-OCD-0018f |
Specification of spectral compression |
Demonstration |
|
|
REQ-OCD-0018g |
Continuum subtraction |
Demonstration |
|
|
REQ-OCD-0018h |
Continuum subtraction specification |
Demonstration |
|
|
REQ-OCD-0018i |
Effect of Flip Mirror on QLDs |
Demonstration |
|
|
REQ-OCD-0018j |
Spectra display specification |
Demonstration |
|
|
REQ-OCD-0018k |
Idle Mode parameters |
Demonstration |
|
|
REQ-OCD-0018l |
Run Mode parameters |
Demonstration |
|
|
REQ-OCD-0018m |
Display Time |
Test |
|
|
REQ-OCD-0019a |
Focal Plane Mask Wheel Blank |
Demonstration |
|
|
REQ-OCD-0019b |
Filter Wheel Blank |
Demonstration |
|
|
REQ-OCD-0019c |
Focal Plane Wheel Slits |
Demonstration |
|
|
REQ-OCD-0019d |
Artificial Calibration Sources |
Demonstration |
|
|
REQ-OCD-0020 |
Polarimetry |
Demonstration |
|
|
REQ-OCD-0021 |
System Sensitivity |
Analysis |
Test §5.13 |
|
REQ-OCD-0022 |
Point sources K≥3 |
Analysis |
Test |
|
REQ-FPR-0001 |
Not used |
- |
|
|
REQ-FPR-0002 |
Cold Stop Alignment |
Analysis |
Test §5.4 |
|
REQ-FPR-0003 |
Focus |
Analysis |
|
|
REQ-FPR-0004 |
Not Used |
- |
|
|
REQ-FPR-0005 |
OIWFS Feed |
Demonstration (1) |
|
|
REQ-FPR-0006 |
Not Used |
- |
|
|
REQ-FPR-0007 |
OIWFS Filters |
Demonstration |
|
|
REQ-FPR-0008 |
OIWFS Wavelength Sensitivity |
(1) |
|
|
REQ-FPR-0009 |
OIWFS Focus |
Analysis |
|
|
REQ-FPR-0010 |
Optical Baffling |
Analysis |
|
|
REQ-FPR-0011 |
Not Used |
- |
|
|
REQ-FPR-0012 |
Dust Cover |
Demonstration |
|
|
REQ-FPR-0013 |
Dust Removal |
Demonstration |
|
|
REQ-FPR-0014 |
Vignetting |
Analysis |
|
|
REQ-FPR-0015 |
Order Sorting Filters |
Demonstration |
|
|
REQ-FPR-0016 |
Not Used |
- |
|
|
REQ-FPR-0017 |
Cold Stop |
Demonstration |
|
|
REQ-FPR-0018 |
Coatings Characteristics |
Demonstration |
|
|
REQ-FPR-0019 |
Coatings and Thermal Cycling |
Demonstration |
|
|
REQ-FPR-0020 |
Not Used |
- |
|
|
REQ-FPR-0021 |
Optical Components in Vacuum |
Demonstration |
|
|
REQ-FPR-0022 |
Optical Comp Temp Cycling |
Demonstration |
|
|
REQ-FPR-0100 |
Detector Bias Variations |
Test |
|
|
REQ-FPR-0101 |
Detector Gain Variations |
Test |
|
|
REQ-FPR-0102 |
Detector Format |
Demonstration |
|
|
REQ-FPR-0103 |
Not Used |
- |
|
|
REQ-FPR-0104 |
Detector Characteristics |
Demonstration |
|
|
REQ-FPR-0105… REQ-FPR-0114 |
Not used |
- |
|
|
REQ-FPR-0115 |
Detector Mechanical Interface |
Analysis |
|
|
REQ-FPR-0116 |
Detector Thermal Interface |
Demonstration |
|
|
REQ-FPR-0117 |
Detector Optical Interface |
Analysis |
|
|
REQ-FPR-0118 |
Detector Electrical Interface |
Demonstration |
|
|
REQ-FPR-0119 |
Detector Controller |
Demonstration |
|
|
REQ-FPR-0120 |
Detector Controller Mech I/F |
Demonstration |
|
|
REQ-FPR-0121 |
Detector Controller Thermal I/F |
Demonstration |
|
|
REQ-FPR-0122 |
OIWFS Detector |
Demonstration |
|
|
REQ-FPR-0123 |
OIWFS Detector Controller |
Demonstration |
|
|
REQ-FPR-0124 |
OIWFS Det Contr Mech I/F |
Demonstration |
|
|
REQ-FPR-0125 |
OIWFS Det Contr Thermal I/F |
Demonstration |
|
|
REQ-FPR-0126 |
OIWFS Detector Optical I/F |
Analysis |
|
|
REQ-FPR-0127 |
OIWFS Detector Electrical I/F |
Demonstration |
|
|
REQ-FPR-0200 |
Cold Stop Alignment |
Analysis |
Test §5.4 |
|
REQ-FPR-0201 |
Movement of Spectra |
Test |
Test §5.10 |
|
REQ-FPR-0202 |
Tracking with OIWFS |
Test |
Test |
|
REQ-FPR-0203 |
Not Used |
- |
|
|
REQ-FPR-0204 |
Mech and Thermal Tolerances |
Analysis |
|
|
REQ-FPR-0205 |
Temperature Gradients |
Analysis |
|
|
REQ-FPR-0206 |
Thermal Transients |
Analysis |
|
|
REQ-FPR-0207 |
Space Requirements |
Demonstration |
|
|
REQ-FPR-0208 |
Electronic Enclosures |
Demonstration |
|
|
REQ-FPR-0209 |
Access to Electr Enclosures |
Demonstration |
|
|
REQ-FPR-0210 |
Access to Vacuum Ports |
Demonstration |
|
|
REQ-FPR-0211 |
Access to Cooling Water Ports |
Demonstration |
|
|
REQ-FPR-0212 |
Access to Dry Air Ports |
Demonstration |
|
|
REQ-FPR-0213 |
Mechanical Connections |
Demonstration |
|
|
REQ-FPR-0214 |
Total Mass |
Test |
|
|
REQ-FPR-0215 |
Center of Gravity |
Test |
|
|
REQ-FPR-0216 |
Balance Tolerance |
Analysis |
|
|
REQ-FPR-0217 |
Ballast Weight |
Demonstration |
|
|
REQ-FPR-0218 |
Spectrograph Thermal Stability |
Test |
|
|
REQ-FPR-0219 |
Cool Down Time |
Test (1) |
|
|
REQ-FPR-0220 |
Warm Up Time |
Test (1) |
|
|
REQ-FPR-0221 |
Detector Thermal Stability |
Test |
|
|
REQ-FPR-0222 |
Vibration |
Demonstration (1) |
|
|
REQ-FPR-0223 |
Vacuum System Holding Areas |
Demonstration |
|
|
REQ-FPR-0224 |
Vacuum Pump Capacity |
Demonstration |
|
|
REQ-FPR-0225 |
Vacuum System Operating Proc |
Demonstration |
|
|
REQ-FPR-0226 |
Vacuum System Test Set-up |
Demonstration |
|
|
REQ-FPR-0227 |
Mechanism Safety |
Analysis |
|
|
REQ-FPR-0228 |
Metric Dimensioning |
Demonstration |
|
|
REQ-FPR-0229 |
Metric Dimensions on Drawings |
Demonstration |
|
|
REQ-FPR-0230 |
Metric Fasteners |
Demonstration |
|
|
REQ-FPR-0231 |
Repeatability of Configuration |
Test |
|
|
REQ-FPR-0232 |
Instrument Handling |
Demonstration |
|
|
REQ-FPR-0300 |
Control System Operability |
Demonstration |
|
|
REQ-FPR-0301 |
Configuration Time |
Test |
|
|
REQ-FPR-0302 |
Impact on Mechanism Accuracy |
Analysis |
|
|
REQ-FPR-0303 |
Impact on Science Performance |
Analysis |
|
|
REQ-FPR-0304 |
Temperature Control |
Demonstration |
|
|
REQ-FPR-0305 |
Detector Temperature |
Test |
|
|
REQ-FPR-0306 |
Optical Elements Temperature |
Demonstration |
|
|
REQ-FPR-0307 |
Rate of Temperature Change |
Test |
|
|
REQ-FPR-0308 |
Speeding the Warming up |
Test |
|
|
REQ-FPR-0400 |
Electronic Design Requirements |
Demonstration |
|
|
REQ-FPR-0401 |
Grounding and Shielding |
Analysis |
|
|
REQ-FPR-0402 |
Electrostatic Discharge |
Demonstration |
|
|
REQ-FPR-0403 |
Power Dissipation into Air |
Analysis |
|
|
REQ-FPR-0404 |
Power Dissipation into ISS |
Analysis |
|
|
REQ-FPR-0405 |
Surface Temperatures |
Test |
|
|
REQ-FPR-0406 |
Not Used |
- |
|
|
REQ-FPR-0407 |
Temperature Monitoring |
Demonstration |
|
|
REQ-FPR-0408 |
Temperature Sensor Locations |
Demonstration |
|
|
REQ-FPR-0409 |
Temperature Sensor Interfaces |
Demonstration |
|
|
REQ-FPR-0500 |
Software Design Requirements |
Demonstration |
|
|
REQ-FPR-0501 |
Use of EPICS |
Demonstration |
|
|
REQ-FPR-0502 |
EPICS System |
Demonstration |
|
|
REQ-FPR-0503 |
Use of CICS |
Demonstration |
|
|
REQ-FPR-0504 |
Not Used |
- |
|
|
REQ-FPR-0505 |
Interfaces to Gemini System |
Demonstration |
|
|
REQ-FPR-0506 |
Gemini Supplied ICDs |
Demonstration |
|
|
REQ-FPR-0507 |
Gemini Supplied CICS |
Demonstration |
|
|
REQ-FPR-0508 |
Gemini Supplied OIWFS I/F |
Demonstration |
|
|
REQ-FPR-0509 |
Gemini Supplied DHS |
Demonstration |
|
|
REQ-FPR-0510 |
Engineering Interface |
Demonstration |
|
|
REQ-FPR-0511 |
Engineering I/F Physical I/F |
Demonstration |
|
|
REQ-FPR-0512 |
Engineering Interface User I/F |
Demonstration |
|
|
REQ-FPR-0513 |
Eng I/F Command and Control |
Demonstration |
|
|
REQ-FPR-0514 |
Engineering I/F Data Capture |
Demonstration |
|
|
REQ-FPR-0515… REQ-FPR-0524 |
Not Used |
- |
|
|
REQ-FPR-0525 |
Observatory Control System |
Analysis |
Test §4.4 |
|
REQ-FPR-0526… REQ-FPR-0599 |
Not Used |
- |
|
|
REQ-FPR-0600 |
ISS Interface |
Demonstration (1) |
Demonstration §5.1 |
|
REQ-FPR-0601 |
ISS Ports |
Demonstration (1) |
Demonstration §5.1 |
|
REQ-FPR-0602 |
Mounting Plate Flatness |
Demonstration (1) |
|
|
REQ-FPR-0603 |
Mounting Plate Material |
Demonstration (1) |
|
|
REQ-FPR-0604 |
Fasteners |
Demonstration (1) |
|
|
REQ-FPR-0605 |
Optical Feed |
Demonstration |
|
|
REQ-FPR-0606 |
Helium Interface |
Demonstration |
|
|
REQ-FPR-0607 |
Number of Helium Connections |
Demonstration |
|
|
REQ-FPR-0608 |
Length of Helium Lines |
Demonstration |
|
|
REQ-FPR-0609 |
Helium Line Flexibility |
Demonstration |
|
|
REQ-FPR-0610 |
Type of Helium Connectors |
Demonstration |
|
|
REQ-FPR-0611 |
Electric Power Interface |
Demonstration |
|
|
REQ-FPR-0612 |
Number of Power Connections |
Demonstration |
|
|
REQ-FPR-0613 |
Length of Electrical Lines |
Demonstration |
|
|
REQ-FPR-0614 |
Electric Line Flexibility |
Demonstration |
|
|
REQ-FPR-0615 |
Type of Electrical Connectors |
Demonstration |
|
|
REQ-FPR-0616 |
Cooling Water Interface |
Demonstration |
|
|
REQ-FPR-0617 |
No. of Plumbing Connections |
Demonstration |
|
|
REQ-FPR-0618 |
Length of Cooling Water Runs |
Demonstration |
|
|
REQ-FPR-0619 |
Cooling Water Line Flexibility |
Demonstration |
|
|
REQ-FPR-0620 |
Type of Plumbing Connections |
Demonstration |
|
|
REQ-FPR-0621 |
Resistance to Glycol |
Demonstration |
|
|
REQ-FPR-0622 |
Signal , Control and Data I/F |
Demonstration |
|
|
REQ-FPR-0623 |
No. of S, C & D Connections |
Demonstration |
|
|
REQ-FPR-0624 |
S, C, & D Tee-Offs |
Demonstration |
|
|
REQ-FPR-0625 |
Length of S, C, & D Cable Runs |
Demonstration |
|
|
REQ-FPR-0626 |
S, C, & D Line Flexibility |
Demonstration |
|
|
REQ-FPR-0627 |
Vacuum Interfaces |
Demonstration |
|
|
REQ-FPR-0628 |
Dry Air Interface |
Demonstration |
|
|
REQ-FPR-0629 |
No. of Air Line Connections |
Demonstration |
|
|
REQ-FPR-0630 |
Length of Air Lines |
Demonstration |
|
|
REQ-FPR-0631 |
Air Line Flexibility |
Demonstration |
|
|
REQ-FPR-0632 |
Type of Air Line Connector |
Demonstration |
|
|
REQ-FPR-0633 |
A&G to OIWFS CC I/F |
Analysis |
Test §4.4 |
|
REQ-FPR-0634 |
Interlock System Interface |
Demonstration |
Test §4.4 |
|
REQ-FPR-0635 |
GIS Mechanical Interface |
Demonstration |
Test §4.4 |
|
REQ-FPR-0636 |
GIS Electrical Interface |
Demonstration |
Test §4.4 |
|
REQ-FPR-0637 |
OCS to IS Interface |
Analysis |
Test §4.4 |
|
REQ-FPR-0638 |
OCS to DC Interface |
Analysis |
Test §4.4 |
|
REQ-FPR-0639 |
DHS Interface |
Analysis |
Test §4.4 |
|
REQ-FPR-0640 |
A&G to OIWFS Detector I/F |
Demonstration (1) |
Test §4.4 |
|
REQ-FPR-0641 |
Event Bus Interface |
N/A |
|
|
REQ-FPR-0642 |
Synchro Bus Interface |
N/A |
|
|
REQ-FPR-0643 |
Time LAN Interface |
Analysis |
Test §4.4 |
|
REQ-FPR-0644 |
OCS to CC Interface |
Analysis |
Test §4.4 |
|
REQ-FPR-0700 |
Transportation Altitudes |
Analysis |
|
|
REQ-FPR-0701 |
Storage Altitudes |
Analysis |
|
|
REQ-FPR-0702 |
Operation Altitudes |
Analysis |
|
|
REQ-FPR-0703 |
Operational Environment |
Analysis |
|
|
REQ-FPR-0704 |
Survival Environment |
Analysis |
|
|
REQ-FPR-0705 |
Transport Environment |
Analysis |
|
|
REQ-FPR-0706 |
Humidity Environment |
Analysis |
|
|
REQ-FPR-0707 |
Vacuum Environment |
Demonstration |
|
|
REQ-FPR-0708 |
Creating the Vacuum |
Demonstration |
|
|
REQ-FPR-0709 |
Vacuum Quality and Duration |
Analysis |
|
|
REQ-FPR-0710 |
Room Temperature Vacuum |
Analysis |
|
|
REQ-FPR-0711 |
Mechanical Environment |
Analysis |
Demonstration |
|
REQ-FPR-0712 |
Telescope Slew Rates |
Analysis |
|
|
REQ-FPR-0800 |
Documentation |
Demonstration |
|
|
REQ-FPR-0801 |
User’s Manual |
Demonstration |
|
|
REQ-FPR-0802 |
Service and Calibration Manual |
Demonstration |
|
|
REQ-FPR-0803 |
Software Maintenance Manual |
Demonstration |
|
|
REQ-FPR-0804 |
As-Built Drawings |
Demonstration |
|
|
REQ-FPR-0805 |
Drawing Standards |
Demonstration |
|
|
REQ-FPR-0806 |
Drawing Numbering System |
Demonstration |
|
|
REQ-FPR-0807 |
Drawing Filing System |
Demonstration |
|
|
REQ-FPR-0808 |
Training |
|
Demonstration |
|
REQ-FPR-0809 |
Reliability |
Demonstration |
|
|
REQ-FPR-0810 |
Spares |
Demonstration |
|
|
REQ-FPR-0811 |
Continuous Duty |
Analysis |
|
|
REQ-FPR-0812 |
Maintainability |
Demonstration |
|
|
REQ-FPR-0813 |
Standard Components |
Demonstration |
|
|
REQ-FPR-0814 |
Modularity |
Demonstration |
|
|
REQ-FPR-0815 |
Access |
Demonstration |
|
|
REQ-FPR-0816 |
Alignment |
Demonstration |
|
|
REQ-FPR-0817 |
Relative Equipment Arrangemnt |
Demonstration |
|
|
REQ-FPR-0818 |
Subassemblies |
Demonstration |
|
|
REQ-FPR-0819 |
Handling |
Demonstration |
|
|
REQ-FPR-0820 |
Revisability |
Analysis |
|
|
REQ-FPR-0821 |
Lifetime |
Analysis |
|
|
REQ-FPR-0822 |
Toxic Products |
Demonstration |
|
|
REQ-FPR-0823 |
EM Radiation Generation |
Analysis |
|
|
REQ-FPR-0824 |
Susceptibility to EM Radiation |
Analysis |